Free ADU feasibility report →

Whole-Home Remodeling in Seattle. Every room. One price.

Whole floors and whole houses rebuilt end to end: design, structural engineering, permits and construction by one team on one fixed-price contract. 5-year workmanship warranty.

Open main floor after a whole-floor remodel in Kirkland: island kitchen flowing into the living room, by Evercrest

— Plan to built

from the approved plan set to the finished home

storm-damage rebuild of a 1949 home — beforestorm-damage rebuild of a 1949 home — after
beforeafter

storm-damage rebuild of a 1949 home

  • Sand Point, Seattle
  • 2,500 sq ft · main floor + lower level
  • New engineered-truss roof · full rewire and new panel · new upstairs bath · every room refinished
  • 16 weeks from stabilization to keys
  • $241,700 fixed price
View this projectGet Your Free Estimate

free roi report

see how much a remodel adds to your home’s value

Answer 3 quick questions and get a personalized report — costs, value added, and return for your specific ADU, kitchen, or bathroom project.

Calculate my ROI

— Our Work

recent projects

Whole floors and whole houses we have rebuilt across Seattle, the Eastside and Pierce County, with the real scope, timeline and price of each.

loft addition and whole-home remodel in West SeattleCOMPLETED

loft addition and whole-home remodel

West Seattle1,500 sq ft · 320 sq ft loft added
$410,3405.5 months
View Project
two-story whole-home remodel in Capitol Hill, SeattleCOMPLETED

two-story whole-home remodel

Capitol Hill, Seattle2,600 sq ft · 2 beds + 3 baths
$283,00016 weeks
View Project
storm-damage restoration of a 1949 home in Sand Point, SeattleCOMPLETED

storm-damage restoration of a 1949 home

Sand Point, Seattle2,500 sq ft · two levels
$241,70016 weeks
View Project
open-concept kitchen & main-floor remodel in Kirkland, WACOMPLETED

open-concept kitchen & main-floor remodel

Kirkland, WA1,200 sq ft of new floor
$132,5008 weeks
View Project

services & pricing

Whole-Floor Refresh

Whole-Floor Refresh

Floors, interior doors, trim, paint, lighting and electrical across an entire level, with the kitchen and bathrooms staying where they are. The fastest way to make a whole floor feel new. Puyallup: 1,400 sq ft second floor with two new baths, 10 weeks.

from $95 / sq ft (labor)

6-10 weeks typical timeline

Whole-Floor Remodel

Whole-Floor Remodel

A full level, or the whole house, re-planned and rebuilt from the studs: load-bearing walls moved, a new kitchen, new bathrooms, bedrooms, doors and one continuous floor. Capitol Hill: a two-story home, 2,600 sq ft, kitchen and three baths, $283,000.

from $110 / sq ft (labor) · $283,000 for 2,600 sq ft

12-16 weeks typical timeline

Whole-House Rebuild & Restoration

Whole-House Rebuild & Restoration

Structural repairs, new roof framing, a full rewire or re-plumb, then every room finished. For storm or water damage, insurance rebuilds and 1940s-60s houses taken down to the studs. Sand Point: 2,500 sq ft, $241,700.

from $95 / sq ft · $241,700 for 2,500 sq ft

16-24 weeks typical timeline

Addition + Remodel

Addition + Remodel

Add square footage and remodel what you already have under one permit set: a primary-suite wing, a second floor or an attached ADU, with the existing rooms re-planned around it. View Ridge: 854 sq ft added, $373,000.

$350-$450 / sq ft for the addition

6-10 months typical timeline

Installation pricing covers labor, demolition, framing, plumbing, electrical, drywall, tile setting, carpentry, paint, permits and inspections. Finish materials (cabinets, countertops, tile, fixtures, flooring) are selected by you, with our guidance, and are priced separately. The contract price is fixed after design and engineering, before demolition starts.

See your whole-home remodel before we build it

Upload a photo of any room and our AI renovation visualizer previews the finished result in seconds. No commitment. Then our designers turn the direction you like into a real plan set.

Try AI Visualizer
See your whole-home remodel before we build it

— WHY WE ARE DIFFERENT

typical contractor vs evercrest

Budget overruns of 20-40%

Whole-house jobs are where allowances and change orders pile up

Fixed-price contract

Engineering first, then one price. It stays there. Period.

A year of living in a job site

Trades show up one at a time, with empty weeks in between

One sequenced schedule, 10-16 weeks

Capitol Hill: both floors, a kitchen and three baths in sixteen weeks.

Five subcontractors, nobody in charge

The framer blames the plumber, the plumber blames the plans

One team. One project manager.

Framing, plumbing, electrical, tile, cabinets and paint, all coordinated by us.

Structural surprises mid-project

The wall comes down and the price goes up

Engineered and permitted before demo

Load paths, beams and hold-downs on stamped drawings before the first wall moves.

Contractor disappears after the last check

A door sticks or a tile cracks a year later? Not their problem.

5-year workmanship warranty

In writing. Something needs attention? You call us directly.

— Reviews

what homeowners say

5.0 star rating on Google Reviews

Jeffrey Hardman

1 day ago

Evercrest built an ADU for us in Seattle and did a great job. It was a fairly large build, so there was a lot involved, but the project was well organized and the work moved along as expected. The crew did good work and kept the site in decent shape throughout the build. The finished ADU came out really nice and looks like it belongs on the property. We're very happy with it and would recommend Evercrest.

Amy Duncan

4 weeks ago

We hired Evercrest to build an ADU at our Bothell home for my mom, and we're so glad we did. It was our first construction project like this, so we had a lot of questions. Arthur and Alex were easy to work with and always took the time to explain what was going on. Like any project, a couple things came up during construction, but they kept us informed and handled everything without making it stressful. My mom moved in a few weeks ago and loves having her own place while still being close to us. The ADU turned out great, and we're really happy we chose Evercrest.

Steve Schalekamp

1 week ago

Evercrest is the best. The experience working with Arthur and Alex was simple and the results beat our expectations. The clear and timely communication kept our confidence levels high for the execution of our projects even when we were away for a week. We returned to a fully painted house that is gorgeous. The concrete and fence work followed quickly after with similarly high quality results. They will be the first ones I call for future projects.

Megan Boudreault

2 weeks ago

We remodeled our master bathroom with Evercrest and are really happy with how everything turned out. Arthur and Alex were easy to work with and always got back to us when we had questions. The crew was respectful of our home and cleaned up at the end of each day, which I really appreciated since we have two kids and a dog. The bathroom looks so much bigger and brighter now. The tile work came out beautiful and everything feels solid and well built. We would definitely use Evercrest again.

Mary Laya

10 months ago

We had a fantastic experience with Evercrest. From start to finish Alex, co-owner of the company, was attentive to our vision, communicative and responsive during the project. He truly wanted the work to be perfect and wanted us to be 100% satisfied with the job. His team was similarly pleasant and very hard-working. The price was significantly lower than other companies. We will definitely engage Evercrest for our next big project.

Joy Gotten

10 months ago

Amazing work on our kitchen remodel! The team was punctual, professional, and delivered high-quality finishes. Every detail was addressed perfectly. Communication was seamless throughout. Highly recommend

— guarantee

Fixed price. 5-year warranty. See yours.

Get Your Free Estimate

SCOPE OF WORK

What's included in our pricing

Client selects and purchases separately:

  • Cabinets and countertops
  • Tile, stone and flooring material
  • Plumbing fixtures (faucets, showers, tubs, toilets)
  • Lighting fixtures
  • Appliances
  • Interior doors and hardware, if you want to choose them yourself
  • Paint colors

We build the selection schedule with you room by room, so materials are on site before each trade needs them and nothing holds the schedule.

Design & engineering

Floor plans, 3D renderings, structural engineering with stamped drawings for any wall that moves.

Demolition & structural

Selective demolition, new framing, beams, headers and hold-downs, roof framing where the plan calls for it.

Plumbing

Supply and drain lines for every new kitchen and bathroom location, water heater and fixture hookups.

Electrical

New circuits and panel work, recessed and under-cabinet lighting, outlets, GFCI/AFCI, full rewires when the house needs one.

Drywall, trim & paint

Drywall, texture, casing, baseboard, interior doors hung and painted, every wall and ceiling finished.

Flooring

Hardwood, engineered oak, LVP or tile installed as one continuous floor through the whole level.

Kitchens & bathrooms

Cabinet and countertop installation, tile setting and waterproofing, shower glass, vanities and fixtures.

Permits & inspections

Plan submittal, city or county permits, every rough-in and final inspection scheduled and passed by us.

our guarantees

We spend the time at the beginning so there are no surprises at the end

5-Year Workmanship Warranty

Covers our work on every room, on top of the manufacturer warranties on what goes into it. If something needs attention, you call us directly.

Fixed Price Guarantee

Itemized cost breakdown by room and by trade before work begins. The contract price is the final price. No allowances that quietly double.

Daily Progress Updates

Photo updates every working day from your project manager. Dust containment and a clean site, even with the whole floor open.

2-Hour Response Time

Submit a form or call. Our team responds within 2 business hours to schedule your complimentary in-home walkthrough.

We Handle All Permits

Seattle SDCI, King County, Pierce County or your city: plan submittal, structural review, inspections. You don't deal with the permit desk.

Final Walkthrough Sign-Off

Joint inspection of every room. Punch-list items addressed immediately. Nothing is signed off until you are 100% satisfied.

From first call to final walkthrough, structured, transparent, and planned around how you will live through it.

Our 7-Step Build Process

  1. 1

    Initial Consultation

    Call or submit a form. We respond within 2 hours to schedule a free in-home walkthrough of every room you want to change.

    Cost: FREE
  2. 2

    Whole-Home Assessment

    Measurements, structure, plumbing and electrical condition, what stays and what moves. We tell you on the spot what is realistic.

    2-3 hrs
  3. 3

    Design & Engineering

    Floor plan, 3D renderings and a stamped structural set for any wall, beam or roof that changes.

    2-4 wks
  4. 4

    Fixed-Price Proposal

    Itemized cost by room and trade, material schedule, timeline and payment plan. The number you sign is the number you pay.

    5 days
  5. 5

    Contract & Permits

    Permit set submitted to the city or county. Structural reviews take longer than a bathroom permit, so we file first and order long-lead materials while we wait.

    4-8 wks
  6. 6

    Construction

    Mon-Fri, 8 AM-5 PM. Demolition, framing, rough-ins, inspections, drywall, finishes, in one sequence. Daily photo updates.

    10-16 wks
  7. 7

    Walkthrough & Warranty

    Joint inspection, punch list closed, every fixture and system tested. 5-year workmanship warranty and a direct line to us.

    5 years

LIVING THROUGH IT

Stay or move out? Here's how our clients handle a whole-floor remodel.

Most of our whole-floor clients stay in the house: a second floor gets rebuilt while the family lives on the main floor, or the lower level becomes home base. A whole-house rebuild usually means moving out for the demolition and rough-in weeks.

We phase the house, not just the schedule

On a two-story project we rebuild one floor while the family lives on the other, then swap. We seal the work zone with dust walls and a separate entrance where the layout allows, and keep one bathroom working at all times.

Set up a temporary kitchen

If the kitchen is in scope, move a microwave, mini-fridge and portable cooktop to the dining room or garage before demo day. Cabinets and appliances are installed in the last weeks, so the kitchen comes back before the paint is dry elsewhere.

Know when moving out is cheaper

When the roof, the electrical panel or every bathroom is being replaced at once, six to eight weeks of a short-term rental usually costs less than the delays of working around a family. We tell you which case you are in at the proposal stage.

/ faq

whole-home remodeling questions

It depends on how much of the house is structural and how many wet rooms are in scope. Our published projects give the real range: a whole-floor refresh of 1,400 sq ft with two new bathrooms in Puyallup was $82,300; an open-concept kitchen with 1,200 sq ft of new oak floor in Kirkland was $132,500 including the kitchen materials; a whole-house storm rebuild of a 2,500 sq ft Sand Point home with a new roof, full rewire and every room refinished was $241,700; and a 2,600 sq ft two-story Capitol Hill home rebuilt from the studs on both floors with a new kitchen and three bathrooms was $283,000. As a rule of thumb, a whole-floor refresh starts around $95 per sq ft of installation, and a full gut remodel with new kitchen and baths starts around $110 per sq ft before finish materials.

A whole-floor refresh runs 6-10 weeks on site. A whole-floor or whole-house remodel with a new kitchen and bathrooms runs 12-16 weeks: both our two-story Capitol Hill remodel and the Sand Point rebuild took sixteen weeks from demolition to keys. Add 4-8 weeks before that for structural engineering and the permit review, which we use to order long-lead materials so construction starts the week the permit is issued.

Start with a walkthrough, not a wish list. We look at the structure, the plumbing and electrical, and the rooms you actually use, then tell you what is worth moving and what is worth keeping. From there you get a floor plan and 3D renderings, a stamped structural set if any wall moves, and one itemized fixed price. You decide on the full scope once, with real numbers, instead of room by room over three years.

Yes. Any structural change, new plumbing or electrical location, roof framing or added square footage needs a permit from the Seattle Department of Construction and Inspections (SDCI), or from King County, Pierce County or your city outside Seattle. Whole-house permits go through structural review, so plan on 4-8 weeks. We prepare and submit the plan set, handle revisions and schedule every inspection.

Yes. That is what a whole-floor remodel usually is. A structural engineer sizes the beams, posts and hold-downs, the drawings are stamped and permitted, and the new framing is inspected before it is covered. On the Capitol Hill project we moved load-bearing walls to open the kitchen to the living space and relocate three bathrooms.

For a whole-floor project, usually yes: we rebuild one level while you live on the other, keep one bathroom working and seal the work zone with dust walls. For a whole-house rebuild where the roof, the electrical panel or every bathroom is replaced at once, we recommend moving out for the demolition and rough-in weeks. We tell you which case you are in at the proposal stage.

Most Seattle homes we rebuild are from that era. We test suspect materials before demolition and use licensed abatement where needed, replace knob-and-tube and undersized panels with a full rewire, and swap galvanized supply lines for PEX or copper while the walls are open. These items are priced into the fixed contract after the assessment, not discovered as change orders.

Yes. The Sand Point project started with a tree through the roof of a 1949 home: we tarped and shored the house, brought in a structural engineer, produced an 11-sheet plan set approved by Seattle SDCI and rebuilt the roof on engineered trusses, then rewired the house and finished every room in sixteen weeks. We document the scope so it lines up with the adjuster's estimate and keep the fixed price separate from the claim.

Four situations come up again and again: you bought an older house and want it to work before you move in; the layout is wrong and only moving walls fixes it; several rooms are failing at once, so the kitchen, the bathrooms and the floors would each need their own contractor anyway; or you are planning for the next twenty years and want one coherent house instead of three remodels in different styles. Doing it once means one design, one permit set, one mobilization and one continuous floor, which is cheaper and faster than the same rooms done over several years.

It does not come back to you. Our contract is a fixed price, not cost-plus with allowances: the scope is engineered and itemized before demolition, and the price you sign is the price you pay. The only things that change the number are changes you ask for, priced in writing before we do them, or a hidden condition no one could see, such as rot inside a closed wall, which we document with photos and price the same way. On the published projects above the final price was the contract price.

Yes, and we plan the phases so each one stands on its own: the structure, plumbing and electrical for the whole house are designed once, then built floor by floor as your budget and schedule allow. Phasing costs more in total than doing everything at once, because every phase pays for its own setup and permit, but it lets you stay in the house and spread the spend.

Most of our clients use a home equity line of credit, a cash-out refinance or a renovation loan that borrows against the after-remodel value, and the fixed-price contract is what lenders want to see. Our financing page walks through the options; payments on the contract are tied to milestones, so you draw funds as the work is completed.

In most Seattle neighborhoods, yes. Selling and buying costs 8-10% of the home's value in commissions, excise tax and closing costs before you have changed anything, and a comparable updated house carries a premium. A $250,000-$300,000 whole-floor remodel keeps your location, your lot and your interest rate, and the 2025 Cost vs. Value report shows mid-range remodels in the Pacific region recouping most of their cost at resale.

Yes. An addition and a remodel of the existing rooms go on one permit set and one contract. Our View Ridge project added an 854 sq ft attached ADU to a Seattle home for $373,000, with the structure tied into the existing foundation and the new roof and siding matched to the house. Additions run $350-$450 per sq ft depending on foundation and roof work.

Your whole-home remodeling contractor in Seattle

Evercrest LLC is a licensed, bonded and insured general contractor serving Seattle and King County, Washington. We take on whole-floor and whole-house remodels across Seattle neighborhoods including Capitol Hill, Sand Point, View Ridge, Ballard, Queen Anne, Wallingford, Green Lake, Ravenna, Greenwood, Meadowbrook, Columbia City and Beacon Hill, and on the Eastside in Kirkland, Bellevue, Redmond, Bothell and Woodinville. Whether you want one level refreshed, a whole floor re-planned around a new kitchen and bathrooms, or a storm-damaged house rebuilt from the roof down, you get one team, one fixed price and a 5-year warranty.

— Service Area

Alongside whole-home remodeling, Evercrest builds ADUs and DADUs, home additions, kitchens and bathrooms, so the rooms you add and the rooms you remodel are planned and permitted together.

Whole-floor refresh installation starts at $95 per sq ft; a full whole-floor or whole-house remodel with new kitchen and bathrooms starts at $110 per sq ft, with every project priced as one fixed contract after engineering.

Get Your Free Estimate

Whole-home planning tips, delivered to your inbox

Monthly notes on sequencing, budgets, permits and materials for Seattle homeowners planning a bigger remodel. No spam. Unsubscribe anytime.

Whole-home planning tips, delivered to your inbox

Ready to rebuild the whole floor, or the whole house?

Schedule a free in-home walkthrough. We will assess the structure, plumbing and electrical, discuss what moves and what stays, and deliver an itemized fixed-price proposal with 3D renderings.

445 269 4020

/ For homeowners and property owners in Seattle & King County only

Respond within 2 business hours