Free ADU feasibility report · apply by Oct 31 →
● Completed · Redmond, WA · King County Eastside

Studs to spa —
four rooms at once.

A powder room refreshed, a full bathroom taken back to the studs and rebuilt, an unused laundry room turned into a second full bath, and a brand-new basement laundry — four rooms, one Evercrest crew, one fixed-price project.

Finished main bathroom with charcoal feature tile and oak vanity in Redmond, WA
Redmond
King County · WA
570
Sq ft touched
8 wks
On site
5-year
Workmanship warranty
Insured
Licensed & bonded
$68.7K
Investment
the brief

Four wish-list projects — done in one visit.

The homeowners had a list that had built up over years: a dated powder room, a tired main bathroom, an unused laundry room that could be doing more, and a basement that could finally take the washer and dryer off the main floor. Instead of four contractors across four disruptions, Evercrest scoped all four as one fixed-price project — one crew, one set of permits, the plumbing, tile and electrical done in a single coordinated pass.

Every room was taken back to the studs where it mattered — new supply and drain lines, cement board, waterproofing — then finished in one consistent palette, so the four rooms read as one home rather than four separate projects.

What we did
  • Powder room — full refresh, 28 sq ft
  • Main bathroom — studs-out rebuild, 48 sq ft
  • Laundry → second full bath, 54 sq ft
  • New basement laundry, 220 sq ft
  • Plumbing, tile & electrical in one pass
  • One permit set, one crew, one fixed price
the main bath · studs → finished

Drag to see the transformation.

The main bathroom was taken all the way back — cement-board shower stall, open plumbing wall, bare subfloor — then rebuilt in charcoal feature tile with a walk-in glass shower. Drag the handle to compare the same room, demolition to finished.

Redmond main bathroom during demolition — cement board and open plumbingFinished Redmond main bathroom with charcoal tile walk-in shower
beforeafter
Main bathroom with walk-in charcoal-tile shower and oak vanity, Redmond WA
1 · the main bathroom · 48 sq ft

A full bath, taken to spa-grade.

Gutted to the studs and rebuilt — a new walk-in glass shower in charcoal feature tile with a rain head and handheld, brand-new floors, a light-oak floating vanity with a white quartz top, a new toilet, and matte-black fixtures throughout.

Oak vanity with white quartz and black mirror in the Redmond main bathroom
The vanity
oak · quartz · black
Charcoal feature-tile walk-in shower with matte-black rain head, Redmond WA
The shower
charcoal tile · black
Wood-plank porcelain walk-in shower with glass and niche, Redmond second bath
2 · the second full bath · from the old laundry · 54 sq ft

A laundry room, turned into a full bathroom.

Where there had never been drainage, Evercrest ran new plumbing and built a second full bathroom — a new shower, toilet and vanity: a walk-in shower lined in warm wood-plank porcelain, a walnut floating vanity with quartz, a hex-tile floor and vertical black sconces.

Walnut floating vanity with vertical black sconces, Redmond second bath
The vanity
walnut · quartz
Second full bathroom with wood-plank shower and walnut vanity, Redmond WA
The new bath
wood-plank · hex floor
Powder room with floating black vanity and round mirror, Redmond WA
3 · the powder room · 28 sq ft

Small room, big statement.

A guest half-bath — toilet and washbasin — brought fully up to date: a floating black vanity against a white fluted feature tile, a round black-framed mirror, matte-black fixtures and a warm wood floor.

Floating black vanity and round black-framed mirror, Redmond powder room
The vanity
floating · black
White fluted feature tile and matte-black fixtures, Redmond powder room
The details
fluted tile · black
New basement laundry room with stacked washer and dryer, Redmond WA
4 · the new basement laundry · 220 sq ft

Laundry, moved off the main floor.

Evercrest ran new wiring and plumbing to relocate the washer and dryer to the basement, laid a new floor, and built a real laundry room — a stacked washer-dryer, a run of cabinets, a quartz counter and a deep utility sink with a pro-style black faucet.

Laundry cabinets, quartz counter and utility sink, Redmond WA
The counter
cabinets · quartz
Deep utility sink with pro-style black faucet, Redmond laundry
The sink
deep · pro faucet
what each room costs today

Four rooms, priced room by room.

What these projects run individually at today’s prices — and what the whole four-room project came in at, on a single fixed-price contract.

Powder room refresh$12,000 – $15,000
Full bathroom remodel$25,000
Laundry room → full bath conversion$30,000
Relocate laundry to the basement$10,000
This project, all four rooms$68,700
what it’s made of

Materials & finishes, room by room.

One material language across four rooms — matte black, warm wood, quartz and glass — each room its own character.

Main bathroom

  • Charcoal feature tile walk-in shower
  • Rain head + handheld, matte black
  • Light-oak floating vanity, quartz top
  • Frameless glass, wood-lined niche

Second bath

  • Wood-plank porcelain walk-in shower
  • Black round rain head + handheld
  • Walnut floating vanity, quartz top
  • Hex-tile floor, vertical black sconces

Powder room

  • Floating black vanity
  • White fluted feature tile
  • Round black-framed mirror
  • Matte-black fixtures, wood floor

Basement laundry

  • Stacked washer / dryer, relocated
  • Cabinet run + quartz counter
  • Deep utility sink, pro-style faucet
  • New 240V circuit, supply & drain

Fixtures & surfaces

  • Matte black throughout
  • Oak & walnut vanities
  • Quartz tops in every room
  • Glass shower panels

Behind the walls

  • New rough-in plumbing — incl. a bath where none existed
  • Dedicated electrical, room by room
  • Every step permitted & inspected
  • One fixed-price contract
what homeowners ask us first

The questions before a bathroom remodel — answered here.

Every Redmond remodel starts with the same doubts. Here is how this King County Eastside project put each one to rest.

01“Can you add a bathroom where there wasn’t one?”

Yes — here we converted an unused laundry room into a full second bathroom, running new supply and drain lines for a shower, toilet and vanity where there had never been any.

02“Four projects — will my house be torn up for months?”

No. Scoping all four rooms as one project meant one crew and one schedule — roughly six to eight weeks — instead of four separate disruptions.

03“Do you handle the plumbing, electrical and permits?”

End to end — new rough-in plumbing and dedicated electrical for every room, including the relocated basement laundry, all permitted and inspected.

04“Do you remodel bathrooms near me in Redmond?”

Yes — Evercrest serves Redmond, Sammamish, Kirkland, Bellevue, Woodinville and Duvall, across the King County Eastside.

Free · on-site · no obligation

Planning a bathroom remodel?

Get a real range — layout, timeline and a fixed price — before you commit to anything.

Finished main bathroom with walk-in shower and oak vanity in Redmond, WA
Evercrest LLC · Licensed Seattle-area general contractor · #EVERCL*745DO · UBI 604988178 · evercrest.us