Three finished Evercrest projects, each with its contract price, what that price covered and how long the build took. One fixed-price contract for design, engineering, permits and construction. No allowances that run out, no change orders for things we should have planned for.

400 sq ft sage-green DADU with French doors in a Seattle back yard

Seattle · Meadowbrook

Studio DADU

$216,300

400 sq ft · $541 / sq ft all-in

One open room with a quartz kitchenette, a 90 sq ft sleeping nook, a 48 sq ft bath with a tiled walk-in shower, vaulted ceiling, three skylights, French doors.

4.5 months of constructionSee the project
576 sq ft cottage with a covered porch and loft windows in Puyallup

Puyallup · Pierce County

One-bedroom cottage

$292,700

576 sq ft + 432 sq ft loft · $508 / sq ft of living area

Bedroom, full bath, kitchen with an island and full-size appliances, in-unit laundry, a living room vaulted to 16 feet, a storage loft and a 144 sq ft covered porch.

4 months of constructionSee the project
White attached ADU with French doors and a patio in View Ridge, Seattle

Seattle · View Ridge

Two-bedroom attached ADU

$373,000

854 sq ft · $437 / sq ft all-in

Two bedrooms, two full baths, a full kitchen, in-unit laundry and a private entrance, added to an existing home under one Seattle SDCI permit.

6 months of constructionSee the project

These are the contract prices of the projects shown, on their lots, with their finishes. Your number depends on the size, the finishes and what your lot needs. The feasibility report tells you which of the items below apply to you before you commit to anything.

What would it cost on your lot?

Your address first. Within 1 business day you get what fits and which of the site costs below apply to you.

Free · No obligation · Report within 1 business day

In the fixed price

What the contract covers

  • Architectural plans and the structural engineering, stamped by a Washington-licensed PE
  • Permit application, SDCI or county review, and every round of corrections
  • Foundation, framing, roof, siding, windows and exterior doors
  • Plumbing, electrical, a ductless heat pump, insulation to the energy code
  • Drywall, paint, flooring, trim, tile, cabinets, quartz counters, fixtures, appliances
  • Utility connections from the main house to the new unit: sewer branch, water, power
  • Every inspection, the final walkthrough, a 10-year warranty on the frame and foundation and 2 years on everything else

Paid separately or lot-dependent

What it does not cover

Permit and plan-review fees paid to the city or county
$6,000–$15,000
King County sewer capacity charge for a new connection
billed monthly by the county for 15 years
Washington sales tax on the contract
10.1%–10.5% depending on the city
Electrical service upgrade when the main panel has no spare capacity
$3,000–$6,000
Survey, geotechnical report or arborist letter when the lot needs one
$1,500–$5,000 each
Removing protected trees, re-grading a slope, long utility trenches
$2,000–$25,000
Landscaping, decks and paving beyond restoring the work area
by scope

Ranges are what we have seen on King and Pierce County lots in 2025–2026. The feasibility report lists the ones that apply to your property, with their estimate, before the first meeting.

Compare bids

Ten things an ADU quote should say, in writing

Tick what your current quote covers. Whatever stays unticked is what to ask about before you sign, or what shows up later as an extra.

0 of 10 covered

Send me this checklist with Evercrest’s answers

You get the list as ticked above, our answer to every line and a price for your lot. Phone or email, whichever you prefer.

We reply within 2 business hours · No obligation

/ faq

ADU pricing questions

Because a per-foot number hides what it covers. Our finished projects came in between $437 and $541 per square foot all-in, with design, engineering, permits, utilities and finishes. Quotes you see for $300 to $350 per foot usually cover the construction labor and materials only. We would rather show the real number of a real cottage.

After engineering, before the permit is filed. By then the plans, the site conditions and the finish selections are known, so the contract price does not move. Changes you ask for during construction are priced in writing before the work.

The kitchen, the bath, the utility connections and the permit cost about the same whether the unit is 400 or 850 square feet. Adding a bedroom adds framing, flooring and drywall, which are the cheap parts. That is why the 854 sq ft attached ADU came in at $437 per foot and the 400 sq ft studio at $541.

Send us the address. Within one business day you get a feasibility report: zoning, setbacks, trees, utilities and the permits your lot needs, with the site costs that apply. Then we meet on site and walk through the options. No cost, no obligation.

Ready to Build Your ADU?

Get a free, no-obligation site assessment. We'll evaluate your property, walk you through the permit process, and give you a realistic budget range — all at no cost.

445 269 4020

/ For homeowners and property owners in Seattle & King County only

Respond within 2 business hours

Call