COMPLETEDKitchen Remodeling in Seattle. 8 weeks. One price.
We design it. We build it. We guarantee it. Fixed-price contract, 3D renderings, 5-year warranty. All permits handled.

— Transformation
before and after kitchen remodel

beforeafterOpen-Concept Conversion
- Capitol Hill, Seattle
- 200 sq ft — Load-bearing wall removed, island added
- Custom cabinetry, quartz countertops, new lighting
- 6 weeks
- Completed 2025
— Our Work
recent projects
Real results with transparent scope and pricing from our kitchen remodeling projects across Seattle, WA and King County.
COMPLETED
COMPLETED
COMPLETEDservices & pricing

Full Kitchen Remodel
Complete renovation: custom cabinetry, countertops, backsplash, new flooring, plumbing and electrical upgrades, painting. All trades coordinated by one project manager.
from $24,900 / ~20 cabinets, ~50 sq ft countertop
8-10 weeks typical timeline

Open-Concept Conversion
Remove walls between kitchen and living areas. Structural engineering, permits, support beam installation, island addition, and complete kitchen rebuild. Transform flow and light.
from $35,000+ / includes structural work
10-12 weeks typical timeline

Custom Kitchen Upgrade
Targeted upgrades: cabinet replacement, new countertops, backsplash, updated lighting, appliance installation. Keep existing layout, refresh everything else.
from $18,000 / scope-dependent
6-8 weeks typical timeline
Kitchen remodeling services we offer. Installation pricing includes all labor, plumbing, electrical, painting, and carpentry. Finish materials (cabinets, countertops, appliances) selected separately by client.
See your kitchen remodel before we build it
Upload a photo of your current kitchen and our AI renovation visualizer generates a preview of the finished result. No commitment. See the potential in seconds.
Try AI Visualizer
— WHY WE ARE DIFFERENT
typical contractor vs evercrest
Budget overruns of 20-40%
Kitchen remodels are the worst offenders for hidden costs
Fixed-price contract
Price locks after engineering. Stays there. Period.
3-6 months of chaos
No working kitchen for months. Eating out every night.
Done in 8-10 weeks, not 3-6 months
We coordinate all trades. No one waits for anyone.
5 different subcontractors, no coordination
Plumber waits for electrician who waits for cabinets
One team. One project manager.
Cabinet installers, fabricators, electricians, plumbers — all coordinated.
No idea what result looks like
Pick materials from a catalog and hope for the best
3D renders before we start
See the finished kitchen before a single cabinet is removed.
Contractor disappears after the job
Cabinet door warps in 6 months? Not their problem.
5-year workmanship warranty
In writing. Something needs attention? You call us directly.
— guarantee
Fixed price. 5-year warranty. See yours.
SCOPE OF WORK
What's included in our pricing
Client selects and purchases separately:
- Cabinets (stock, semi-custom, or custom)
- Countertops (quartz, granite, solid surface)
- Appliances (range, fridge, dishwasher, hood)
- Sink and faucet
- Backsplash tile selection
- Flooring material
- Lighting fixtures
- Hardware and accessories
We guide you on material selection, budget allocation, and vendor recommendations so every dollar works toward the kitchen you want.
Plumbing
Rough plumbing, supply lines, drain work, sink hookup, dishwasher connection.
Electrical
Circuits, outlets, GFCI, under-cabinet lighting wiring, appliance hookups, code compliance.
Drywall & Painting
Wall repair, patching, priming, and full interior painting of kitchen area.
Flooring installation
Tile, LVP, or hardwood install in the kitchen area. Material selected by client.
Cabinet & appliance install
Professional mounting, leveling, hardware, appliance fitting and connection.
Backsplash tile
Tile installation in the cooking area. All cutting, grouting, and sealing.
Demolition
Removal of existing cabinets, countertops, backsplash, flooring, and disposal of all debris.
our guarantees
We spend the time at the beginning so there are no surprises at the end
5-Year Workmanship Warranty
Covers defects from normal wear, on top of manufacturer warranties. If something needs attention, you call us directly. No disappearing contractors.
Fixed Price Guarantee
Itemized cost breakdown before work begins. The contract price is the final price. No surprise charges, no hidden fees, no scope creep.
Daily Progress Updates
Photo updates every working day. Direct communication with your project manager. Clean job site with dust containment maintained daily.
2-Hour Response Time
Submit a form or call. Our team responds within 2 business hours to schedule your complimentary in-home consultation.
We Handle All Permits
All required Seattle SDCI permits submitted and managed by us. You don't deal with the city. Permit processing typically 2-4 weeks.
Final Walkthrough Sign-Off
Joint inspection of all work. Punch-list items addressed immediately. Functionality testing of every fixture. Nothing signed off until you are 100% satisfied.
From first call to final walkthrough — structured, transparent, and stress-free.
Our 7-Step Build Process
- 1step
Initial Consultation
Call or submit a form. We respond within 2 hours to schedule your free in-home consultation.
Cost: FREE - 2step
In-Home Assessment
Precise measurements, plumbing and electrical evaluation, layout discussion, material guidance.
1-2 hrs - 3step
Detailed Proposal
Itemized cost breakdown, 3D renderings, material specs, timeline, and payment schedule.
5 days - 4step
Contract & Permits
Fixed price agreement signed. Start date secured. All required permits submitted by us.
2-4 wks - 5step
Construction
Mon-Fri, 8 AM-5 PM. Daily photo updates. Clean job site. Dust containment system in place.
8-10 wks - 6step
Final Walkthrough
Joint inspection. Punch-list addressed immediately. All fixtures and systems tested.
~1 hr - 7step
Warranty & Support
5-year workmanship warranty. Direct support line. No disappearing contractors.
5 years
LIVING THROUGH IT
Your kitchen will be out of commission. Here's how to survive.
Most families stay home during the remodel. The kitchen is unusable for 6-8 weeks. These tips make it manageable.
Set up a temporary kitchen
Move a microwave, mini-fridge, and portable cooktop to another room — a dining area, garage, or spare bedroom works well. Keep a kettle, paper plates, and basic utensils nearby. Most families find this setup comfortable for the full 8−10 weeks.
Meal prep ahead
Cook and freeze meals the week before demo starts. Stock up on paper plates, disposable utensils, and easy meals. A crockpot and instant pot become your best friends.
We contain the mess
Dust barriers go up on day one. We work Mon-Fri, 8 AM-5 PM — evenings and weekends are yours. Your project lead sends daily photo updates so you always know what happened.
/ faq
kitchen remodeling questions
The installation cost for a standard kitchen with approximately 20 cabinets and around 50 sq ft of countertop is $24,900, including all required plumbing and electrical work as well as painting. Flooring and all finish materials (cabinets, countertops, fixtures, appliances) are not included and will be selected separately by the client. Kitchen remodel costs in Seattle run 15−20% above the national average due to labor rates, permitting requirements, and the age of most homes.
Most kitchens are complete in 8−10 weeks. Our process includes a detailed design consultation, 3D renderings, transparent pricing, and a realistic timeline. We coordinate all trades — cabinet installers, countertop fabricators, electricians, plumbers — ensuring quality work and timely completion. Add 2−4 weeks for Seattle SDCI permit review if structural changes are involved.
Yes, we can remove load-bearing walls. It requires a structural engineer's design, proper Seattle SDCI permits, and installation of the correct support beam or framing to meet code and ensure the home remains fully safe and compliant. Wall removal costs typically range from $5,000 to $25,000 depending on the span and structural requirements.
Our pricing includes demolition, rough plumbing and electrical work, drywall and painting, flooring installation, cabinet and appliance installation labor, backsplash tile in the cooking area, and all required carpentry and finish labor. Finish materials such as cabinets, countertops, appliances, or fixtures are not included and are selected separately by the client. We provide guidance on material selection and budget allocation.
Yes, most families stay home during a kitchen remodel. The kitchen will be unusable for several weeks, so we recommend setting up a temporary cooking area in another room with a microwave, mini-fridge, and portable cooktop. We use dust containment systems and work Mon-Fri 8−5 to minimize disruption.
We typically recommend quartz for its durability, non-porous surface, low maintenance, and wide variety of styles. Granite and solid surface materials like Corian are also excellent options depending on budget and aesthetic preference. Quartz remains the top choice in Seattle for its resistance to stains and moisture in the Pacific Northwest climate.
Most kitchen remodels that involve plumbing, electrical, or structural changes require permits from the Seattle Department of Construction and Inspections (SDCI). Cosmetic updates under $6,000 in a 6-month period are generally exempt. We handle all permit filing, inspections, and scheduling as part of our service.
According to the 2025 Cost vs. Value Report, minor kitchen remodels in the Pacific region recoup 80−88% of cost at resale, and major remodels recover 65−75%. In Seattle's competitive housing market, an updated kitchen is consistently one of the strongest factors in resale speed and buyer appeal.
Your trusted kitchen contractor in Seattle
Evercrest LLC is a licensed, bonded, and insured general contractor serving Seattle and King County, Washington state. We provide professional kitchen remodeling services across Seattle neighborhoods including Ballard, Capitol Hill, Queen Anne, Fremont, Wallingford, Green Lake, Ravenna, Greenwood, Meadowbrook, University District, Columbia City, and Beacon Hill. Whether you need a custom kitchen upgrade, an open-concept conversion, or a full kitchen remodel, our team delivers fixed-price quality work with a 5-year warranty.
— Service Area
In addition to kitchen remodeling, Evercrest specializes in ADU and DADU construction, bathroom remodeling, and whole-home renovations.
The average kitchen remodel installation cost starts at $24,900, with total project costs varying based on material selections.
Get Your Free EstimateKitchen design trends — delivered to your inbox
Monthly tips on materials, layouts, and smart budgeting for Seattle homeowners. No spam. Unsubscribe anytime.

Ready to upgrade your kitchen?
Schedule a free in-home visit. We will measure your space, discuss your vision, and deliver a detailed proposal with 3D renderings within 5 business days.
/ For homeowners and property owners in Seattle & King County only