COMPLETED
ADU Builderin Seattle
Attached ADUs and backyard cottages for Seattle homeowners: design, SDCI permits and construction by one team.
What can you build on your lot?
Google Reviews
BBB Rating: A+Accredited Business— Built in Seattle
ADUs we built in Seattle
Permitted through Seattle SDCI, engineered by a licensed PE, built by one crew on a fixed price.
COMPLETED
COMPLETEDVaulted Backyard Cottage with Kitchenette
COMPLETEDTwo-Bedroom Two-Story Cottage
License verifiedBuildZoom · Top 12% in WA
houzzPortfolio on HouzzEvery project, photo by photo- Fixed-price contractPrice locked before work starts
- 10-year warrantyFrame & foundation · 2 years on the rest
— Featured completed build
approved plan → finished adu

Completed · Seattle, View Ridge
attached adu
Two bedrooms, two full baths, in-unit laundry and a private entrance — designed, engineered, permitted and built by Evercrest on one fixed-price contract. From the first call to keys in 10 months.
- 854 sq ft added · 2,494 sq ft home after
- Fixed-price $373,000 · 6 months of construction
- Permitted & engineered — Seattle SDCI #7076560-CN
- Fixed price — no change orders
- 10-year warranty on frame & foundation
— Three formats we have built and priced
which one fits your lot?
Contract prices of finished Evercrest projects, design, engineering, permits and construction included. Pick the closest one and we check your lot against it.

Seattle · Meadowbrook
Studio DADU
$216,300
400 sq ft · 4.5 months of construction
One open room with a quartz kitchenette, a 90 sq ft sleeping nook, a 48 sq ft bath with a tiled walk-in shower, vaulted ceiling, three skylights, French doors.

Puyallup · Pierce County
One-bedroom cottage
$292,700
576 sq ft + 432 sq ft loft · 4 months of construction
Bedroom, full bath, kitchen with an island and full-size appliances, in-unit laundry, a living room vaulted to 16 feet, a storage loft and a 144 sq ft covered porch.

Seattle · View Ridge
Two-bedroom attached ADU
$373,000
854 sq ft · 6 months of construction
Two bedrooms, two full baths, a full kitchen, in-unit laundry and a private entrance, added to an existing home under one Seattle SDCI permit.
Full breakdown of what is included and what the lot adds: ADU pricing 2026.
— Home Additions in Seattle & the Eastside
need more house, not a second one?
A second story, a master suite, a bigger kitchen, a wing for the parents. Same team, same fixed-price contract signed before work starts, same permits handled for you, from $350 per sq ft all-in. Design, PE-stamped engineering, SDCI or city permits and construction, 5-year workmanship warranty.
Second-story addition
Double the floor area without touching the yard. New floor framing, stairs, roof and a full structural check of the existing walls.
1,000 sq ft · $180K–$280K · 8–10 months
Master suite or bedroom wing
A rear or side addition with a bedroom, walk-in closet and bath, tied into the existing roofline and siding so it never reads as an add-on.
500 sq ft · $120K–$180K · 6–8 months
Kitchen & living extension
Push the back wall out, open the kitchen to the garden and gain a real dining space. Load-bearing walls removed and re-framed with PE-stamped engineering.
400 sq ft · $80K–$150K · 6–8 months
Attached ADU / in-law suite
An addition with its own entrance, kitchen and bath: parents close by, a rental later. Counts as an ADU under Seattle and Eastside codes.
600–850 sq ft · $160K–$373K · 8–12 months

View Ridge, Seattle
854 sq ft attached addition
2 bed / 2 bath, private entrance · $373,000 fixed price · 6 months of construction
See the project →
West Seattle
320 sq ft loft addition under a new roof
Second level on the same footprint, whole house remodeled · $410,340 · 5.5 months of construction
See the project →
Capitol Hill, Seattle
Two-story whole-home remodel
Load-bearing walls moved and re-framed, new kitchen and 3 baths · $283,000 fixed price · 16 weeks
See the project →Tell us what you want to add.
Second story, master suite, bigger kitchen or an in-law suite: we reply within 2 business hours with a time for a free on-site visit, and you get a fixed price before any work starts.
— Why Seattle homeowners choose Evercrest
What we promise — in writing
your price locks after engineering. it doesn't move.
Most Seattle contractors give you an estimate. We give you a guarantee. Once engineering is finalized, the number in your contract is the number you pay. Any changes are agreed before engineering closes — after that, nothing shifts.
architecture, engineering, construction. one team. one contract.
No separate architect. No separate contractor. No gaps in accountability when scope changes. Design, engineering, and build are sold as a single package — one point of responsibility, start to finish.
one project manager. the whole way through.
One person who knows your project inside out — from design sign-off to final city inspection. Same-day response during business hours. No departments. No repeating yourself halfway through the build.
10-year warranty. in writing. in your contract.
Every ADU is backed by a 10-year warranty on the frame and foundation and a 2-year warranty on everything else, documented in the contract. If anything fails due to our work, we fix it at no cost. Not a verbal promise — a contractual obligation.
— ADU Cost & Permits in the City of Seattle
what a seattle adu costs & how long it takes
Most detached ADUs in Seattle cost roughly $125,000–$350,000 to build, with a typical two-bedroom backyard cottage around $320,000. Attached ADUs, basement units and garage conversions come in lower; premium finishes and steep or tight lots push higher.
Permitting through Seattle SDCI runs about 4–5 months for a DADU, then 6–8 months of construction. Evercrest handles the drawings, PE-stamped engineering and the full SDCI process under one design-permit-build contract, and the price is fixed once engineering is done.
Typical ranges for planning only — your exact cost and timeline come from a free ADU feasibility review of your parcel.
— Seattle ADU Regulations 2025–2026
what you can build
on a seattle lot
Seattle adopted permanent Neighborhood Residential (NR) zoning — the rules that cover most single-family lots — in December 2025, in force since January 21, 2026 (Council Bill 120993), building on Washington's statewide ADU laws (HB 1337 and HB 1110). Here are the rules that decide what fits on your property.
units per lot
up to 4Up to 4 total dwelling units on any Neighborhood Residential (NR) lot — configured as detached cottages, townhouses, stacked flats, or any combination. Up to 6 units if the lot is within ¼ mile of a major transit stop or includes 2 affordable units. At most two of the units can be ADUs (Council Bill 120993, in force since January 21, 2026).
max adu size
1,000 sq ftMaximum gross floor area per ADU in NR zones. Actual buildable size also depends on your lot's Floor Area Ratio (FAR) — the ratio of total floor area to lot size — and lot coverage; on smaller lots, these limits may restrict you below 1,000 sq ft.
height limit
up to 32 ftIn NR zones — same as the principal dwelling, plus an allowance for pitched roofs. Up to 42 ft where large trees are planted or retained, or a Tier 2 tree is kept. Two-story DADUs are now fully possible.
side / rear setback
5 feetStandard minimum from side and rear property lines for an ADU. Zero setback where the rear yard abuts an alley. Buildings must be at least 5 ft apart. Front setbacks follow the lot's zoning: 15 ft with one or two units, 10 ft with three or more.
owner occupancy
not requiredYou can rent out both your main home and ADU/DADU without living on the property. Owner-occupancy requirement was eliminated by 2019 reforms and reinforced by HB 1337 in 2025.
parking required
noOff-street parking requirements eliminated for ADUs. You can include parking based on your needs, but the code does not require it. Reduces cost and enables projects on smaller lots.
lot coverage
up to 50%For lots with multiple dwelling units, maximum lot coverage increased from 35% to 50%. On a typical 5,000 sq ft lot, this means 2,500 sq ft of building footprint — enough for a primary home plus additional units.
city fees & MHA
exemptADUs are exempt from Seattle's MHA affordable-housing payment and from street-improvement requirements, regardless of zone. The King County sewer capacity charge still applies to a new connection, billed monthly for 15 years.
Every Seattle ADU follows the same 7-step process — from the first site visit to your final SDCI inspection and walkthrough.
Our 7-Step Build Process
from first call to keys in hand: 8–14 months
Jeffrey Hardman
1 day ago
Evercrest built an ADU for us in Seattle and did a great job. It was a fairly large build, so there was a lot involved, but the project was well organized and the work moved along as expected. The crew did good work and kept the site in decent shape throughout the build. The finished ADU came out really nice and looks like it belongs on the property. We're very happy with it and would recommend Evercrest.
Amy Duncan
4 weeks ago
We hired Evercrest to build an ADU at our Bothell home for my mom, and we're so glad we did. It was our first construction project like this, so we had a lot of questions. Arthur and Alex were easy to work with and always took the time to explain what was going on. Like any project, a couple things came up during construction, but they kept us informed and handled everything without making it stressful. My mom moved in a few weeks ago and loves having her own place while still being close to us. The ADU turned out great, and we're really happy we chose Evercrest.
Steve Schalekamp
1 week ago
Evercrest is the best. The experience working with Arthur and Alex was simple and the results beat our expectations. The clear and timely communication kept our confidence levels high for the execution of our projects even when we were away for a week. We returned to a fully painted house that is gorgeous. The concrete and fence work followed quickly after with similarly high quality results. They will be the first ones I call for future projects.
Megan Boudreault
2 weeks ago
We remodeled our master bathroom with Evercrest and are really happy with how everything turned out. Arthur and Alex were easy to work with and always got back to us when we had questions. The crew was respectful of our home and cleaned up at the end of each day, which I really appreciated since we have two kids and a dog. The bathroom looks so much bigger and brighter now. The tile work came out beautiful and everything feels solid and well built. We would definitely use Evercrest again.
Mary Laya
10 months ago
We had a fantastic experience with Evercrest. From start to finish Alex, co-owner of the company, was attentive to our vision, communicative and responsive during the project. He truly wanted the work to be perfect and wanted us to be 100% satisfied with the job. His team was similarly pleasant and very hard-working. The price was significantly lower than other companies. We will definitely engage Evercrest for our next big project.
Joy Gotten
10 months ago
Amazing work on our kitchen remodel! The team was punctual, professional, and delivered high-quality finishes. Every detail was addressed perfectly. Communication was seamless throughout. Highly recommend
/ faq
Seattle ADU questions, answered
Almost every Neighborhood Residential lot in Seattle can take at least one ADU, and most can take two — one attached and one detached — with no owner-occupancy or parking requirement. What limits you is floor-area ratio, lot coverage, setbacks and trees. Our free feasibility review checks your parcel against the current SDCI rules and tells you yes or no, and how big, before you commit to anything.
In the greater Seattle area, the typical cost to build an ADU is approximately $350 to $450 per square foot. This price includes construction labor and rough materials — framing, structural work, and core building systems. It does not include finish materials like flooring, paint, kitchen and bathroom materials, fixtures, or appliances. The total cost depends on size, site conditions, permit requirements, and the level of finishes chosen.
Plan on roughly 4 to 5 months for a detached ADU permit through Seattle SDCI, then 6 to 8 months of construction for a typical 600 to 1,000 sq ft cottage. Attached ADUs and garage conversions usually move faster. Evercrest prepares the drawings, the PE-stamped engineering and the SDCI submittal in-house, so there is no hand-off between an architect and a builder.
Look for a licensed, bonded, and insured ADU builder with local Seattle-area experience and PE-stamped engineering on every project. The right general contractor handles the full design-permit-build process under one contract — so you are not juggling separate architects, engineers, and crews. Ask to see completed ADU, DADU, garage conversion, and backyard cottage projects near you, check their Google reviews, and confirm they navigate City of Seattle and King/Snohomish County permitting in-house. Evercrest is a licensed Washington ADU company — ADU builder and general contractor in one (#EVERCL*745DO) — with 150+ projects across Puget Sound.
Yes. An ADU above a garage is one of the most space-efficient options on a Seattle lot: parking or storage stays below and a full apartment with its own stair and entrance goes on top. Over an attached garage it is permitted as an attached ADU; over a detached garage it counts as a DADU, with up to 32 feet of height allowed in Neighborhood Residential zones. Most existing garages were not framed or founded to carry a second story, so we start with a structural check — sometimes the garage is reinforced, sometimes it is cheaper to rebuild it as part of the project.
Yes — a mother-in-law suite is simply an ADU built for family. It can be an attached unit with its own entrance, a converted basement or garage, an apartment above the garage, or a detached backyard cottage. For aging parents we plan it step-free where the lot allows: a no-threshold entry, a walk-in shower, wider doors and a bedroom on the main level. It is permitted as a legal dwelling unit, so it can become a rental later.
Yes — in Seattle you can legally rent out your ADU (long-term or short-term), as long as it is properly permitted and registered. ADUs are allowed as rental units under Seattle zoning and building codes. There is no owner-occupancy requirement, meaning you do not need to live in the main house or the ADU in order to rent it out.
Ready to Build Your ADU?
Get a free, no-obligation site assessment. We'll evaluate your property, walk you through the permit process, and give you a realistic budget range — all at no cost.
/ For homeowners and property owners in Seattle & King County only
ADU & DADU builder by city


