ADU Builderin Bothell
Attached ADUs and backyard cottages for Bothell homeowners: design, engineering, city permits and construction by one team on one fixed-price contract.
What can you build on your Bothell lot?
Google Reviews
BBB Rating: A+Accredited Business— Finished Evercrest projects
ADUs and DADUs we have built
Three finished homes with their contract prices and build times: design, engineering, permits and construction by one team.
COMPLETED
COMPLETEDVaulted Backyard Cottage with Kitchenette
COMPLETEDTwo-Bedroom Attached ADU
License verifiedBuildZoom · Top 12% in WA
houzzPortfolio on HouzzEvery project, photo by photo- Fixed-price contractPrice locked before work starts
- 10-year warrantyFrame & foundation · 2 years on the rest
— Bothell ADU rules, checked November 2026
what you can build
on a bothell lot
Bothell's ADU rules sit in Municipal Code section 12.14.135. Ordinance 2445, passed in December 2024, allowed two ADUs per lot and raised the height limit for detached units; Ordinance 2461, passed on July 8, 2025, removed the extra parking stall. These are the numbers that decide what fits on a Bothell lot.
adus per lot
2Two accessory dwelling units are allowed per lot, added to, created within or detached from the main house (BMC 12.14.135).
max adu size
1,200 sq ftAn ADU may be developed up to 1,200 sq ft. Detached ADUs are exempt from the rule that limits accessory buildings to 5 percent of the lot area.
detached height
30 ftA detached ADU may be no taller than 30 ft, or 33 ft when it is built over an existing accessory structure (BMC 12.14.135.E).
rear setback
as the houseA detached ADU keeps the same rear yard setback as the main house in your zone. On an alley, the city's setbacks for structures adjoining alleys apply instead (BMC 12.14.070.B).
parking
0 spacesOn July 8, 2025 the City Council eliminated required parking minimums for new development, and the ADU section no longer asks for an additional off-street stall.
impact fees
50 % capThe city will not charge impact fees on an ADU greater than 50 percent of the impact fees that would be imposed on the main home (BMC 12.14.135.G).
Sources: Bothell Municipal Code 12.14.135 · City of Bothell, accessory dwelling unit handout 3f · City of Bothell, July 2025 code changes for parking · Bothell City Council agenda packet, December 10, 2024. City codes change; we check your parcel against the current text in the free feasibility review.
Not sure what fits on your Bothell lot?
Your address first. Within 1 business day you get what fits, what it costs and how long it takes.
— ADU permits & cost in Bothell
how an adu permit works in bothell
ADU permits in Bothell go through Development Services. The application is filed online at MyBuildingPermit under Building, Single Family Residential, Accessory Dwelling Unit. Before applying you need an assigned address letter from the city, and a project that adds floor area needs a water and sewer availability certificate; when the City of Bothell is the provider, that certificate takes up to two weeks.
The city's 2026 fee list for an ADU: a plan check fee based on project valuation, a $231 single-family planning review fee and a 5 percent technology fee at submittal. At issuance: the permit fee, plumbing and mechanical permits at 8 percent of the building permit fee each for a new detached ADU, an $834 residential site review and inspection fee for an addition or a new building, and impact fees.
Bothell does not publish a review time for ADU permits, and we found no pre-approved ADU plan program in the city as of November 2026. We prepare the drawings, the PE-stamped engineering and the submittal, and answer the city's corrections.
What our finished ADUs cost
Contract prices of four finished homes. Each was one fixed-price contract with design, engineering and permit work included.
- Studio cottage400 sq ft · Seattle, Meadowbrook$216,300
- One-bedroom cottage with a storage loft576 sq ft · Puyallup$292,700
- Two-bedroom attached ADU854 sq ft · Seattle, View Ridge$373,000
- Two-bedroom two-story cottage957 sq ft · Seattle, Pinehurst$432,112
These are the prices of those specific homes on their lots. Your number comes from a free feasibility review of your property.
Check my Bothell lot →— Featured completed build
framing → finished dadu

beforeafterCompleted September 2026 · Puyallup, WA
detached adu (dadu)
One bedroom, one full bath, a living room vaulted to 16 feet, in-unit laundry and a 432 sq ft storage loft under the roof — designed, permitted and built by Evercrest on one fixed-price contract.
- 576 sq ft of living space + 432 sq ft loft
- Fixed-price $292,700 · built in 4 months, completed September 2026
- Permitted & engineered — Pierce County #1059615
- Fixed price — no change orders
- 10-year warranty on frame & foundation
Want the same for your lot?
Your address first. Within 1 business day you get what fits, what it costs and how long it takes.
— Three formats we have built and priced
which one fits your lot?
Contract prices of finished Evercrest projects, design, engineering, permits and construction included. Pick the closest one and we check your lot against it.

Seattle · Meadowbrook
Studio DADU
$216,300
400 sq ft · 4.5 months of construction
One open room with a quartz kitchenette, a 90 sq ft sleeping nook, a 48 sq ft bath with a tiled walk-in shower, vaulted ceiling, three skylights, French doors.

Puyallup · Pierce County
One-bedroom cottage
$292,700
576 sq ft + 432 sq ft loft · 4 months of construction
Bedroom, full bath, kitchen with an island and full-size appliances, in-unit laundry, a living room vaulted to 16 feet, a storage loft and a 144 sq ft covered porch.

Seattle · View Ridge
Two-bedroom attached ADU
$373,000
854 sq ft · 6 months of construction
Two bedrooms, two full baths, a full kitchen, in-unit laundry and a private entrance, added to an existing home under one Seattle SDCI permit.
Full breakdown of what is included and what the lot adds: ADU pricing 2026.
Every ADU follows the same 7 steps, from the first site visit to the final Bothell inspection and walkthrough.
Our 7-Step Build Process
from first call to keys in hand: 8–14 months
— Why Bothell homeowners choose Evercrest
What we promise — in writing
your price locks after engineering. it doesn't move.
Most Seattle contractors give you an estimate. We give you a guarantee. Once engineering is finalized, the number in your contract is the number you pay. Any changes are agreed before engineering closes — after that, nothing shifts.
architecture, engineering, construction. one team. one contract.
No separate architect. No separate contractor. No gaps in accountability when scope changes. Design, engineering, and build are sold as a single package — one point of responsibility, start to finish.
one project manager. the whole way through.
One person who knows your project inside out — from design sign-off to final city inspection. Same-day response during business hours. No departments. No repeating yourself halfway through the build.
10-year warranty. in writing. in your contract.
Every ADU is backed by a 10-year warranty on the frame and foundation and a 2-year warranty on everything else, documented in the contract. If anything fails due to our work, we fix it at no cost. Not a verbal promise — a contractual obligation.
Jeffrey Hardman
1 day ago
Evercrest built an ADU for us in Seattle and did a great job. It was a fairly large build, so there was a lot involved, but the project was well organized and the work moved along as expected. The crew did good work and kept the site in decent shape throughout the build. The finished ADU came out really nice and looks like it belongs on the property. We're very happy with it and would recommend Evercrest.
Amy Duncan
4 weeks ago
We hired Evercrest to build an ADU at our Bothell home for my mom, and we're so glad we did. It was our first construction project like this, so we had a lot of questions. Arthur and Alex were easy to work with and always took the time to explain what was going on. Like any project, a couple things came up during construction, but they kept us informed and handled everything without making it stressful. My mom moved in a few weeks ago and loves having her own place while still being close to us. The ADU turned out great, and we're really happy we chose Evercrest.
Steve Schalekamp
1 week ago
Evercrest is the best. The experience working with Arthur and Alex was simple and the results beat our expectations. The clear and timely communication kept our confidence levels high for the execution of our projects even when we were away for a week. We returned to a fully painted house that is gorgeous. The concrete and fence work followed quickly after with similarly high quality results. They will be the first ones I call for future projects.
Megan Boudreault
2 weeks ago
We remodeled our master bathroom with Evercrest and are really happy with how everything turned out. Arthur and Alex were easy to work with and always got back to us when we had questions. The crew was respectful of our home and cleaned up at the end of each day, which I really appreciated since we have two kids and a dog. The bathroom looks so much bigger and brighter now. The tile work came out beautiful and everything feels solid and well built. We would definitely use Evercrest again.
Mary Laya
10 months ago
We had a fantastic experience with Evercrest. From start to finish Alex, co-owner of the company, was attentive to our vision, communicative and responsive during the project. He truly wanted the work to be perfect and wanted us to be 100% satisfied with the job. His team was similarly pleasant and very hard-working. The price was significantly lower than other companies. We will definitely engage Evercrest for our next big project.
Joy Gotten
10 months ago
Amazing work on our kitchen remodel! The team was punctual, professional, and delivered high-quality finishes. Every detail was addressed perfectly. Communication was seamless throughout. Highly recommend
/ faq
Bothell ADU questions, answered
In most cases, yes. Bothell allows two ADUs per lot, attached or detached. A lot developed with middle housing, or one with critical areas or their buffers, is limited to one. What else limits you is your zone's setbacks and hard surface coverage, plus trees, slopes and utilities. Our free feasibility review checks your parcel against the current Municipal Code and tells you what fits before you commit to anything.
Up to 1,200 sq ft. A detached ADU can be 30 ft tall, or 33 ft when it is built over an existing accessory structure. A conversion of existing space can exceed 1,200 sq ft with the Community Development Director's approval, up to 40 percent of the main home's gross floor area.
No. The City Council eliminated required parking minimums for new development on July 8, 2025, and the ADU section of the code no longer asks for an additional off-street stall.
The city's 2026 list: a plan check fee based on project valuation, a $231 planning review fee and a 5 percent technology fee at submittal; at issuance the permit fee, plumbing and mechanical permits at 8 percent of the building permit fee each for a new detached ADU, an $834 site review and inspection fee, and impact fees. Impact fees on an ADU are capped at 50 percent of what the main home would be charged.
The city does not publish a review time for ADU permits. The one stated time is up to two weeks for the water and sewer availability certificate when Bothell is the provider. We file as early as the drawings allow and order long-lead materials while the permit is in review.
Our finished projects give the real range: $216,300 for a 400 sq ft studio cottage, $292,700 for a 576 sq ft one-bedroom with a storage loft, $373,000 for an 854 sq ft two-bedroom attached ADU and $432,112 for a 957 sq ft two-story cottage. Each was one fixed-price contract with design, engineering and permit work included. Your number depends on the size, the finishes and what your lot needs, and comes from a free feasibility review.
Ready to Build Your ADU?
Get a free, no-obligation site assessment. We'll evaluate your property, walk you through the permit process, and give you a realistic budget range — all at no cost.
/ For homeowners and property owners in Seattle & King County only
ADU & DADU builder by city