Free ADU feasibility report →
Two-story backyard cottage built by Evercrest: beige lap siding, purple door, stone path through the garden

ADU Builderin Kirkland

Attached ADUs and backyard cottages for Kirkland homeowners: design, engineering, city permits and construction by one team on one fixed-price contract.

What can you build on your Kirkland lot?

Free · No obligation · Report within 1 business day

— Finished Evercrest projects

ADUs and DADUs we have built

Three finished homes with their contract prices and build times: design, engineering, permits and construction by one team.

Two-Bedroom Two-Story Cottage in Seattle, Pinehurst · King CountyCOMPLETED

Two-Bedroom Two-Story Cottage

Seattle, Pinehurst · King County957 sq ft
$432,1125 months · 2026
View Project
Vaulted Backyard Cottage with Kitchenette in Seattle, Meadowbrook · King CountyCOMPLETED

Vaulted Backyard Cottage with Kitchenette

Seattle, Meadowbrook · King County400 sq ft
$216,3004.5 months
View Project
Two-Bedroom Attached ADU in Seattle, View Ridge · King CountyCOMPLETED

Two-Bedroom Attached ADU

Seattle, View Ridge · King County854 sq ft
$373,0006 months of construction
View Project

— Kirkland ADU rules, checked November 2026

what you can build
on a kirkland lot

Kirkland's ADU rules sit in Zoning Code section 115.07. The City Council updated them on June 17, 2025 (Ordinance O-4905) and removed the last parking requirement with Ordinance O-4948, adopted September 15, 2026 and in effect since September 28, 2026. Some city web pages still show the older parking wording; the ordinance text below is the current one.

adus per lot

2

Two ADUs are permitted per single-family home: one attached and one detached, or two of either type (KZC 115.07).

Properties in the Residential-L Shoreline Environment are allowed one ADU

max adu size

1,200 sq ft

An ADU may not exceed 1,200 sq ft of gross floor area, attached or detached. Area with less than 5 ft of ceiling height, uncovered rooftop decks and at-grade patios, and up to 200 sq ft of other exterior elements are not counted.

The Planning and Building Director may allow more for an attached ADU that fits within existing floor area on a single floor

height & setbacks

by zone

An ADU must meet the setbacks, height limit and lot coverage that apply to a single-family home in your zone. Kirkland no longer applies a separate, lower accessory-structure height limit to ADUs.

Converting an existing structure, such as a detached garage, is exempt from current setback and lot coverage rules if the nonconformity is not increased

rear yard

5 ft

A detached ADU without alley access may sit as close as 5 ft to the rear property line, provided the part inside the required rear yard is no taller than 15 ft above average building elevation and the yard does not abut an access easement (KZC 115.115(3)(o)).

On an alley, a detached ADU may extend to the rear property line if its eaves stay inside the lot and sight-distance rules are met

parking

0 spaces

ADUs are exempt from the requirement to provide a minimum number of vehicle parking spaces (KZC 115.07.7, as amended by Ordinance O-4948).

separate sale

allowed

An ADU may be segregated in ownership from the main house, and a detached ADU can be placed on its own unit lot through a unit lot subdivision.

Not available on properties in the Residential-L Shoreline Environment

Not sure what fits on your Kirkland lot?

Your address first. Within 1 business day you get what fits, what it costs and how long it takes.

Free · No obligation · Report within 1 business day

— ADU permits & cost in Kirkland

how an adu permit works in kirkland

The property owner applies for an ADU permit with Kirkland's Planning and Building Department. The registration includes a covenant recorded with the King County Recorder's Office that notes the ADU on the property.

The city's own planning guide says the permitting process for a standard ADU generally takes approximately 3 months, with additional time for design and construction. We prepare the drawings, the PE-stamped engineering and the submittal, and answer the city's corrections.

Kirkland also runs a pre-approved DADU plan program. The city says an application that uses one of those plans takes less time. If one of them suits your lot we can build from it; if not, we design a custom plan.

What our finished ADUs cost

Contract prices of four finished homes. Each was one fixed-price contract with design, engineering and permit work included.

These are the prices of those specific homes on their lots. Your number comes from a free feasibility review of your property.

Check my Kirkland lot →

— Featured completed build

framing → finished dadu

Puyallup DADU — framing stage, 2026Puyallup DADU — finished, September 2026
beforeafter

Completed September 2026 · Puyallup, WA

detached adu (dadu)

One bedroom, one full bath, a living room vaulted to 16 feet, in-unit laundry and a 432 sq ft storage loft under the roof — designed, permitted and built by Evercrest on one fixed-price contract.

  • 576 sq ft of living space + 432 sq ft loft
  • Fixed-price $292,700 · built in 4 months, completed September 2026
  • Permitted & engineered — Pierce County #1059615
  • Fixed price — no change orders
  • 10-year warranty on frame & foundation
  • Puyallup DADU kitchen: white shaker cabinets, marble-look quartz island, stainless full-size appliances
    Kitchen: white shaker cabinets, quartz island, full-size appliances
  • Puyallup DADU living room vaulted to 16 feet, ductless heat pump, wood-look plank floor
    Living room: vaulted to 16 feet, ductless heat pump
  • Puyallup DADU bathroom: tiled walk-in shower with a bench behind glass, oak vanity with quartz top
    Bathroom: tiled walk-in shower with a bench, oak vanity

Want the same for your lot?

Your address first. Within 1 business day you get what fits, what it costs and how long it takes.

Free · No obligation · Report within 1 business day

— Three formats we have built and priced

which one fits your lot?

Contract prices of finished Evercrest projects, design, engineering, permits and construction included. Pick the closest one and we check your lot against it.

400 sq ft sage-green DADU with French doors in a Seattle back yard

Seattle · Meadowbrook

Studio DADU

$216,300

400 sq ft · 4.5 months of construction

One open room with a quartz kitchenette, a 90 sq ft sleeping nook, a 48 sq ft bath with a tiled walk-in shower, vaulted ceiling, three skylights, French doors.

See the project
576 sq ft cottage with a covered porch and loft windows in Puyallup

Puyallup · Pierce County

One-bedroom cottage

$292,700

576 sq ft + 432 sq ft loft · 4 months of construction

Bedroom, full bath, kitchen with an island and full-size appliances, in-unit laundry, a living room vaulted to 16 feet, a storage loft and a 144 sq ft covered porch.

See the project
White attached ADU with French doors and a patio in View Ridge, Seattle

Seattle · View Ridge

Two-bedroom attached ADU

$373,000

854 sq ft · 6 months of construction

Two bedrooms, two full baths, a full kitchen, in-unit laundry and a private entrance, added to an existing home under one Seattle SDCI permit.

See the project

Full breakdown of what is included and what the lot adds: ADU pricing 2026.

Every ADU follows the same 7 steps, from the first site visit to the final Kirkland inspection and walkthrough.

Our 7-Step Build Process

from first call to keys in hand: 8–14 months

  1. 1

    Private Site Consultation

    We assess backyard placement, privacy, access routes, slope, and discuss your goals — rental income, multi-gen living, or long-term investment.

    Cost: FREE
  2. 2

    Zoning & Detached Unit Approval Review

    We verify setbacks, height limits, parking requirements, utility access, and DADU-specific Seattle zoning rules for your lot.

    includes: dadu eligibility report
  3. 3

    Structural Proposal & Budget

    Full cost breakdown covering excavation, foundation, framing, roofing, and enclosure — with site-specific adjustments for slope and soil conditions.

    delivery: 5–7 business days
  4. 4

    Contract Execution & Timeline Reservation

    Fixed-price agreement with secured start date and dedicated project team. Your slot in our schedule is confirmed.

    fixed price guarantee
  5. 5

    Full Architectural Design

    Complete layout, exterior style selection, kitchen and bathroom placement, and living flow design — with homeowner sign-off before permitting begins.

    includes: full 3d renders
  6. 6

    Engineering + Utility Planning + Permitting

    Structural calculations, foundation design, roof systems, dedicated sewer trenching, and utility connections. Full permit package submitted and managed.

    permit approval: 6–12 weeks
  7. 7

    Construction + Final Walkthrough + Warranty

    Excavation → utilities & sewer inspection → foundation → framing → enclosure → MEP — mechanical, electrical & plumbing — inspections → drywall, paint, flooring → full kitchen & bathrooms → final city inspection → walkthrough → 10-year frame & foundation warranty, 2 years on everything else.

    build: 10–14 months · 10-year warranty

— Why Kirkland homeowners choose Evercrest

What we promise — in writing

your price locks after engineering. it doesn't move.

Most Seattle contractors give you an estimate. We give you a guarantee. Once engineering is finalized, the number in your contract is the number you pay. Any changes are agreed before engineering closes — after that, nothing shifts.

architecture, engineering, construction. one team. one contract.

No separate architect. No separate contractor. No gaps in accountability when scope changes. Design, engineering, and build are sold as a single package — one point of responsibility, start to finish.

one project manager. the whole way through.

One person who knows your project inside out — from design sign-off to final city inspection. Same-day response during business hours. No departments. No repeating yourself halfway through the build.

10-year warranty. in writing. in your contract.

Every ADU is backed by a 10-year warranty on the frame and foundation and a 2-year warranty on everything else, documented in the contract. If anything fails due to our work, we fix it at no cost. Not a verbal promise — a contractual obligation.

— Reviews

what homeowners say

5.0 star rating on Google Reviews

Jeffrey Hardman

1 day ago

Evercrest built an ADU for us in Seattle and did a great job. It was a fairly large build, so there was a lot involved, but the project was well organized and the work moved along as expected. The crew did good work and kept the site in decent shape throughout the build. The finished ADU came out really nice and looks like it belongs on the property. We're very happy with it and would recommend Evercrest.

Amy Duncan

4 weeks ago

We hired Evercrest to build an ADU at our Bothell home for my mom, and we're so glad we did. It was our first construction project like this, so we had a lot of questions. Arthur and Alex were easy to work with and always took the time to explain what was going on. Like any project, a couple things came up during construction, but they kept us informed and handled everything without making it stressful. My mom moved in a few weeks ago and loves having her own place while still being close to us. The ADU turned out great, and we're really happy we chose Evercrest.

Steve Schalekamp

1 week ago

Evercrest is the best. The experience working with Arthur and Alex was simple and the results beat our expectations. The clear and timely communication kept our confidence levels high for the execution of our projects even when we were away for a week. We returned to a fully painted house that is gorgeous. The concrete and fence work followed quickly after with similarly high quality results. They will be the first ones I call for future projects.

Megan Boudreault

2 weeks ago

We remodeled our master bathroom with Evercrest and are really happy with how everything turned out. Arthur and Alex were easy to work with and always got back to us when we had questions. The crew was respectful of our home and cleaned up at the end of each day, which I really appreciated since we have two kids and a dog. The bathroom looks so much bigger and brighter now. The tile work came out beautiful and everything feels solid and well built. We would definitely use Evercrest again.

Mary Laya

10 months ago

We had a fantastic experience with Evercrest. From start to finish Alex, co-owner of the company, was attentive to our vision, communicative and responsive during the project. He truly wanted the work to be perfect and wanted us to be 100% satisfied with the job. His team was similarly pleasant and very hard-working. The price was significantly lower than other companies. We will definitely engage Evercrest for our next big project.

Joy Gotten

10 months ago

Amazing work on our kitchen remodel! The team was punctual, professional, and delivered high-quality finishes. Every detail was addressed perfectly. Communication was seamless throughout. Highly recommend

/ faq

Kirkland ADU questions, answered

In most cases, yes. Kirkland permits two ADUs per single-family home, attached or detached in any combination. What limits you is your zone's setbacks, height limit and lot coverage, plus trees, slopes and shoreline rules. Our free feasibility review checks your parcel against the current Zoning Code and tells you what fits before you commit to anything.

Up to 1,200 sq ft of gross floor area, attached or detached. Space with less than 5 ft of ceiling height, uncovered rooftop decks and at-grade patios are not counted. Height follows the limit for a single-family home in your zone.

No. Since September 28, 2026 the Zoning Code exempts ADUs from any minimum number of vehicle parking spaces. Older city pages still describe a rule tied to distance from transit; Ordinance O-4948 replaced it.

Yes. The Zoning Code says an ADU may be segregated in ownership from the single-family home, and a detached ADU can go on its own unit lot through a unit lot subdivision. Properties in the Residential-L Shoreline Environment are the exception.

Yes. The city says renting out any unit in Kirkland requires a business license. For short-term rentals there is one more condition: the owner or an authorized agent must occupy the property as a primary residence at least 245 days per year.

The city's planning guide gives approximately 3 months for the permitting process of a standard ADU, plus time for design and construction, and says a pre-approved DADU application takes less time.

Our finished projects give the real range: $216,300 for a 400 sq ft studio cottage, $292,700 for a 576 sq ft one-bedroom with a storage loft, $373,000 for an 854 sq ft two-bedroom attached ADU and $432,112 for a 957 sq ft two-story cottage. Each was one fixed-price contract with design, engineering and permit work included. Your number depends on the size, the finishes and what your lot needs, and comes from a free feasibility review.

Ready to Build Your ADU?

Get a free, no-obligation site assessment. We'll evaluate your property, walk you through the permit process, and give you a realistic budget range — all at no cost.

445 269 4020

/ For homeowners and property owners in Seattle & King County only

Respond within 2 business hours

CallText