Free ADU feasibility report · apply by Oct 31 →
● Completed · Sand Point · Seattle, WA

A new bathroom,
after the storm.

When a fallen tree crushed the roof of a 1949 Sand Point home, the second floor was rebuilt from the framing — including a brand-new upstairs bathroom with a floating vanity, a round mirror and a marble-look tub and shower.

New upstairs bathroom with floating vanity and round black mirror, Sand Point Seattle
Sand Point
Seattle · WA
50
Sq ft
3 wks
Bathroom build
5-year
Workmanship warranty
Insured
Licensed & bonded
$21,730
Bathroom cost
the brief

Rebuilt from the framing, not patched.

A fallen tree came through the roof of a 1949 two-story home in Sand Point. After the house was stabilized and the roof re-engineered, the whole second floor was taken back to framing — which meant the upstairs bathroom could be built new instead of patched around old plumbing.

It got new rough-in plumbing and wiring (the house was fully rewired with a new panel), a waterproofed tub-and-shower surround in marble-look tile with a recessed niche, matte-black fixtures, a floating vanity and a round black mirror — all on plans approved by Seattle SDCI.

What we did
  • Rebuilt from the framing
  • New plumbing & wiring
  • Tub & shower, marble-look tile
  • Recessed niche, matte black
  • Floating vanity, round mirror
  • SDCI-approved plans
Tub and shower in marble-look tile with matte-black fixtures and niche, Sand Point Seattle
the tub & shower

Marble-look tile, matte black, a tub that stays.

The tub and shower are wrapped in large marble-look tile with a recessed niche; matte-black shower head, valve and spout match the vanity hardware and the three-light sconce. A marble-look floor ties the room together.

how it was built

Six steps, one crew, one fixed price.

  1. 01Stabilize

    The house tarped and shored; an independent structural engineer brought in before any rebuilding.

  2. 02Re-frame

    The second floor taken back to framing and rebuilt on the new engineered roof structure.

  3. 03Rough-in

    New plumbing and wiring for the bath — the whole house rewired with a new meter and panel.

  4. 04Waterproof & tile

    Cement board and a membrane around the tub, then marble-look tile, the niche and the floor.

  5. 05Fit-out

    Floating vanity, round mirror, sconce, fixtures and toilet installed.

  6. 06Final walkthrough

    Final inspection on SDCI-approved plans — covered by the 5-year workmanship warranty.

what it cost, line by line

Where the $21,730 went.

This bathroom came to $21,730 of the $241,700 storm-damage rebuild. Here is where the $21,730 went.

Framing & rough-in on the rebuilt floor$4,580
Waterproofing around the tub$1,720
Marble-look tile surround, niche & floor$6,160
New tub & matte-black fixtures$3,240
Floating vanity, top & round mirror$3,890
Toilet, sconce, paint & trim$2,140
Total — this bathroom, 50 sq ft$21,730
Half bath with pedestal sink and white beadboard in the same Sand Point home
part of a bigger project

One room of a whole-house rebuild.

This bath was built as part of a storm-damage rebuild: an engineered roof on raised-heel trusses, a new window header and framing, a full rewire with a new panel and the second floor rebuilt — 16 weeks from stabilization to keys on one fixed price of $241,700.

See the whole storm-damage rebuild →
what it’s made of

Materials & finishes.

Every finish in this bathroom, and what is behind the walls.

Tub & shower

  • Marble-look tile surround
  • Recessed niche
  • Matte-black head, valve, spout
  • New tub

Vanity

  • Floating light-wood vanity
  • White top, black faucet
  • Round black mirror
  • Black cabinet pulls

Room

  • Marble-look floor tile
  • New toilet
  • Three-light black sconce
  • Fresh walls & trim

Behind the walls

  • Rebuilt from the framing
  • New plumbing, full rewire
  • Cement board + waterproofing
  • SDCI-approved plans
what homeowners ask us first

The questions before a bathroom project — answered here.

01“Can you rebuild a bathroom after storm damage?”

Yes. Here the second floor was taken back to framing after a tree came through the roof, so the bathroom was built new — new plumbing, wiring, waterproofing and finishes.

02“Do you work with a structural engineer?”

Yes. On this house an independent structural engineer reviewed the damage, and the rebuild followed plans approved by Seattle SDCI.

03“How long does a bathroom take in a whole-house rebuild?”

This bath took three weeks of work inside a 16-week rebuild, from stabilization to keys.

04“Do you work near me in Seattle?”

Yes — Evercrest works across Seattle, from Sand Point and View Ridge to Capitol Hill, and on the Eastside.

more bathrooms we have built

See another bathroom.

Free · on-site · no obligation

Rebuilding after damage?

Get a real range — scope, engineering, timeline and a fixed price — before you commit to anything.

New marble-look tub and shower in a rebuilt Sand Point home
Evercrest LLC · Licensed Seattle-area general contractor · #EVERCL*745DO · UBI 604988178 · evercrest.us