COMPLETED
DADU Builderin Seattle
A separate small home behind your house: designed, permitted through SDCI and built by one team.
Will a cottage fit in your backyard?
Google Reviews
BBB Rating: A+Accredited Business— Backyard cottages we built
DADUs by Evercrest
Detached cottages from 400 to 957 sq ft — each one engineered by a licensed PE and built by one crew on a fixed price.
COMPLETED
COMPLETEDVaulted Backyard Cottage with Kitchenette
COMPLETED
COMPLETED
COMPLETEDBackyard Cottage with Wraparound Deck
COMPLETEDOne-Bedroom Cottage with Storage Loft
— Three formats we have built and priced
which one fits your lot?
Contract prices of finished Evercrest projects, design, engineering, permits and construction included. Pick the closest one and we check your lot against it.

Seattle · Meadowbrook
Studio DADU
$216,300
400 sq ft · 4.5 months of construction
One open room with a quartz kitchenette, a 90 sq ft sleeping nook, a 48 sq ft bath with a tiled walk-in shower, vaulted ceiling, three skylights, French doors.

Puyallup · Pierce County
One-bedroom cottage
$292,700
576 sq ft + 432 sq ft loft · 4 months of construction
Bedroom, full bath, kitchen with an island and full-size appliances, in-unit laundry, a living room vaulted to 16 feet, a storage loft and a 144 sq ft covered porch.

Seattle · View Ridge
Two-bedroom attached ADU
$373,000
854 sq ft · 6 months of construction
Two bedrooms, two full baths, a full kitchen, in-unit laundry and a private entrance, added to an existing home under one Seattle SDCI permit.
Full breakdown of what is included and what the lot adds: ADU pricing 2026.
License verifiedBuildZoom · Top 12% in WA
houzzPortfolio on HouzzEvery project, photo by photo- Fixed-price contractPrice locked before work starts
- 10-year warrantyFrame & foundation · 2 years on the rest
— DADU Cost & Timeline in Seattle
what a backyard cottage costs & how long it takes
A detached backyard cottage in the Seattle area typically costs $155,000–$350,000: a compact 400 sq ft one-bedroom sits at the low end, a 700–1,000 sq ft two-bedroom around $300,000. A DADU costs more than an attached unit because it needs its own foundation, roof and utility trench from the street or the main house.
Expect about 4–5 months for the Seattle SDCI permit and 6–8 months of construction. The drawings, PE-stamped engineering, sewer and utility planning and the permit submittal are all done in-house, and the price is fixed once engineering is complete.
Typical ranges for planning only — your exact cost and timeline come from a free feasibility review of your backyard.
— Seattle DADU Rules 2025–2026
what fits
in a seattle backyard
Seattle's permanent Neighborhood Residential zoning (Council Bill 120993, adopted December 2025 and in force since January 21, 2026) and Washington's HB 1337 made detached units easier to build than ever: two stories, no parking, no owner-occupancy. These are the numbers that decide what fits behind your house.
units per lot
up to 4Up to 4 total dwelling units on any Neighborhood Residential (NR) lot — configured as detached cottages, townhouses, stacked flats, or any combination. Up to 6 units if the lot is within ¼ mile of a major transit stop or includes 2 affordable units. At most two of the units can be ADUs (Council Bill 120993, in force since January 21, 2026).
max adu size
1,000 sq ftMaximum gross floor area per ADU in NR zones. Actual buildable size also depends on your lot's Floor Area Ratio (FAR) — the ratio of total floor area to lot size — and lot coverage; on smaller lots, these limits may restrict you below 1,000 sq ft.
height limit
up to 32 ftIn NR zones — same as the principal dwelling, plus an allowance for pitched roofs. Up to 42 ft where large trees are planted or retained, or a Tier 2 tree is kept. Two-story DADUs are now fully possible.
side / rear setback
5 feetStandard minimum from side and rear property lines for an ADU. Zero setback where the rear yard abuts an alley. Buildings must be at least 5 ft apart. Front setbacks follow the lot's zoning: 15 ft with one or two units, 10 ft with three or more.
owner occupancy
not requiredYou can rent out both your main home and ADU/DADU without living on the property. Owner-occupancy requirement was eliminated by 2019 reforms and reinforced by HB 1337 in 2025.
parking required
noOff-street parking requirements eliminated for ADUs. You can include parking based on your needs, but the code does not require it. Reduces cost and enables projects on smaller lots.
lot coverage
up to 50%For lots with multiple dwelling units, maximum lot coverage increased from 35% to 50%. On a typical 5,000 sq ft lot, this means 2,500 sq ft of building footprint — enough for a primary home plus additional units.
city fees & MHA
exemptADUs are exempt from Seattle's MHA affordable-housing payment and from street-improvement requirements, regardless of zone. The King County sewer capacity charge still applies to a new connection, billed monthly for 15 years.
Every backyard cottage follows the same 7 steps — from the first site visit to your final SDCI inspection and walkthrough.
Our 7-Step DADU Process
from first call to keys in hand: 8–14 months
— Why Seattle homeowners choose Evercrest
What we promise — in writing
your price locks after engineering. it doesn't move.
Most Seattle contractors give you an estimate. We give you a guarantee. Once engineering is finalized, the number in your contract is the number you pay. Any changes are agreed before engineering closes — after that, nothing shifts.
architecture, engineering, construction. one team. one contract.
No separate architect. No separate contractor. No gaps in accountability when scope changes. Design, engineering, and build are sold as a single package — one point of responsibility, start to finish.
one project manager. the whole way through.
One person who knows your project inside out — from design sign-off to final city inspection. Same-day response during business hours. No departments. No repeating yourself halfway through the build.
10-year warranty. in writing. in your contract.
Every ADU is backed by a 10-year warranty on the frame and foundation and a 2-year warranty on everything else, documented in the contract. If anything fails due to our work, we fix it at no cost. Not a verbal promise — a contractual obligation.
Jeffrey Hardman
1 day ago
Evercrest built an ADU for us in Seattle and did a great job. It was a fairly large build, so there was a lot involved, but the project was well organized and the work moved along as expected. The crew did good work and kept the site in decent shape throughout the build. The finished ADU came out really nice and looks like it belongs on the property. We're very happy with it and would recommend Evercrest.
Amy Duncan
4 weeks ago
We hired Evercrest to build an ADU at our Bothell home for my mom, and we're so glad we did. It was our first construction project like this, so we had a lot of questions. Arthur and Alex were easy to work with and always took the time to explain what was going on. Like any project, a couple things came up during construction, but they kept us informed and handled everything without making it stressful. My mom moved in a few weeks ago and loves having her own place while still being close to us. The ADU turned out great, and we're really happy we chose Evercrest.
Steve Schalekamp
1 week ago
Evercrest is the best. The experience working with Arthur and Alex was simple and the results beat our expectations. The clear and timely communication kept our confidence levels high for the execution of our projects even when we were away for a week. We returned to a fully painted house that is gorgeous. The concrete and fence work followed quickly after with similarly high quality results. They will be the first ones I call for future projects.
Megan Boudreault
2 weeks ago
We remodeled our master bathroom with Evercrest and are really happy with how everything turned out. Arthur and Alex were easy to work with and always got back to us when we had questions. The crew was respectful of our home and cleaned up at the end of each day, which I really appreciated since we have two kids and a dog. The bathroom looks so much bigger and brighter now. The tile work came out beautiful and everything feels solid and well built. We would definitely use Evercrest again.
Mary Laya
10 months ago
We had a fantastic experience with Evercrest. From start to finish Alex, co-owner of the company, was attentive to our vision, communicative and responsive during the project. He truly wanted the work to be perfect and wanted us to be 100% satisfied with the job. His team was similarly pleasant and very hard-working. The price was significantly lower than other companies. We will definitely engage Evercrest for our next big project.
Joy Gotten
10 months ago
Amazing work on our kitchen remodel! The team was punctual, professional, and delivered high-quality finishes. Every detail was addressed perfectly. Communication was seamless throughout. Highly recommend
/ faq
Backyard cottage questions, answered
Usually, yes. A detached unit needs 5 feet to the side and rear lot lines (zero at an alley), and the lot as a whole can now be covered up to 50%. On a typical 5,000 sq ft Seattle lot that leaves room for a 400 to 800 sq ft cottage behind the house, and two stories are allowed. Trees, slopes and sewer access are what actually decide it — our free feasibility review checks your parcel and tells you what size fits.
In the greater Seattle area, the typical cost to build an ADU is approximately $350 to $450 per square foot. This price includes construction labor and rough materials — framing, structural work, and core building systems. It does not include finish materials like flooring, paint, kitchen and bathroom materials, fixtures, or appliances. The total cost depends on size, site conditions, permit requirements, and the level of finishes chosen.
In the Seattle area, building a backyard cottage typically takes about 8 to 14 months from start to finish. This includes permitting, site preparation, construction, and final inspections. For a standard DADU around 1,000−1,500 sq ft, the construction timeline is usually around 8 months. A larger project of around 3,000−3,500 square feet can take closer to 14 months, because it would need to be permitted not as a DADU, but more like a townhouse-type structure. The permitting process for that typically takes longer, and the construction itself also takes additional time, depending on design complexity, site conditions, and city permit review timelines.
An ADU (Accessory Dwelling Unit) is a secondary living unit on the same property as the main house — it can be attached, built inside the home (such as a basement unit), or detached. A DADU (Detached Accessory Dwelling Unit) is a specific type of ADU that is completely separate from the primary residence, typically built as a standalone backyard cottage or small independent structure with no shared walls.
Yes. An ADU above a garage is one of the most space-efficient options on a Seattle lot: parking or storage stays below and a full apartment with its own stair and entrance goes on top. Over an attached garage it is permitted as an attached ADU; over a detached garage it counts as a DADU, with up to 32 feet of height allowed in Neighborhood Residential zones. Most existing garages were not framed or founded to carry a second story, so we start with a structural check — sometimes the garage is reinforced, sometimes it is cheaper to rebuild it as part of the project.
Yes — a mother-in-law suite is simply an ADU built for family. It can be an attached unit with its own entrance, a converted basement or garage, an apartment above the garage, or a detached backyard cottage. For aging parents we plan it step-free where the lot allows: a no-threshold entry, a walk-in shower, wider doors and a bedroom on the main level. It is permitted as a legal dwelling unit, so it can become a rental later.
Yes — in Seattle you can legally rent out your ADU (long-term or short-term), as long as it is properly permitted and registered. ADUs are allowed as rental units under Seattle zoning and building codes. There is no owner-occupancy requirement, meaning you do not need to live in the main house or the ADU in order to rent it out.
Ready to Build Your Backyard Cottage?
Get a free, no-obligation site assessment. We'll evaluate your property, walk you through the permit process, and give you a realistic budget range — all at no cost.
/ For homeowners and property owners in Seattle & King County only